Basebuilding Squat Model 1 is always interesting.
It’s just a lot of work in a little bit of time. You’d think 5×5 may not be much, but when you have to crank to get the work within a time limit, and push as hard as you can all the way through (C.A.T.) oh yea, it’s work.
I went ahead and opted to keep that same pace throughout: about 1 minute rest between everything. That was enough. By the time I got to lunges I could tell my work capacity had decreased some, so it’ll take me a little bit to get back up there.
For the record, I’m experimenting with lunge stride. Today I kept the stride fairly short.
Oh, and I opted to have no knee sleeves nor belt. We’ll see how that goes for me.
- Squats
- bar x 5
- bar x 5
- 150 x 5
- 175 x 4
- 205 x 3
- 225 x 2
- 260 x 1
- 185 x 5
- 185 x 5
- 185 x 5
- 185 x 5
- 185 x 5
- Leg Press
- 225 x 10
- 315 x 10
- 315 x 10
- 315 x 10
- Lunges
- bw x 10e
- bw x 10e
- bw x 10e
- bw x 10e